13-10-5218Equipment Suppliers should implement a comprehensive security program for protecting hardware, firmware and software from malicious code insertion or tampering during development and delivery, taking into consideration that some developmental environments around the world present a higher risk level than others.
13-10-5220Network Operators, Service Providers and Equipment Suppliers should establish and implement a comprehensive physical security program for protecting corporate assets if utilizing foreign sites, including personnel, at those sites.
13-10-5221Network Operators, Service Providers, and Equipment Suppliers should consider limiting the dissemination of information relating to future locations of key leadership.
13-10-5222Network Operators, Service Providers, Equipment Suppliers, and Public Safety should consider providing trouble call centers with a physically diverse back-up capability that can quickly be configured to receive the incoming traffic and take appropriate action.
13-10-5229Network Operators, Service Providers, Property Managers, and Public Safety should have controlled access to comprehensive facility cabling documentation (e.g., equipment installation plans, network connections, power, grounding and bonding) and keep a backup copy of this documentation at a secured off-site location.
13-10-5233Network Operators, Service Providers, Equipment Suppliers, and Public Safety should verify proper functioning of electronic surveillance equipment (e.g., CCTV, access control logs, alarm monitoring) at critical access points after any incident that may impact such equipment.
13-10-5235Network Operators and Service Providers should ensure that impacted alarms and monitors associated with critical utility vaults are operational after a disaster event.
13-10-5236Property Managers should take the lead in restoration efforts of the base building infrastructure for an incident at a multi-tenant facility, ensuring that they have points of contact for each tenant to allow for coordination, support, security, and additional resources as necessary.
13-10-5239Property Managers should maintain crisis management plan(s) of multi-tenant facilities for incident resolution and restoration.
13-10-5242Network Operators, Service Providers, Equipment Suppliers, and Public Safety should reassess the criticality of associated facilities following a catastrophic incident (i.e. loss of one facility may make others more critical).
13-10-5245Network Operators, Service Providers, Equipment Suppliers, and Public Safety should document the use of non- standard equipment or cable during restoration to review and/or replace those devices or cable as appropriate.
13-10-5248Network Operators, Service Providers, Equipment Suppliers, and Public Safety should perform risk assessment on significant network changes (e.g., technology upgrades, temporary or permanent changes due to restoration efforts).
13-10-5250Network Operators and Service Providers should develop an engineering design for critical network elements and inter-office facilities that addresses diversity, and utilize management systems to provision, track, and maintain and restore that inter-office and intra-office diversity.
13-10-5252Network Operators and Public Safety should evaluate the priority on re-establishing diversity of facility entry points (e.g., copper or fiber conduit, network interfaces for entrance facilities) during the restoration process.
13-10-5255Network Operators, Service Providers, and Equipment Suppliers should ensure that temporary wireless networks (e.g., terrestrial microwave, free-space optical, satellite, point-to-point, multi-point, mesh) used during an incident are subsequently disabled or secured.
13-10-5256Network Operators, Service Providers, Equipment Suppliers, and Public Safety should monitor temporary connections of network test equipment that are established for restoration to prevent access by unauthorized personnel.
13-10-5261Network Operators, Service Providers, Property Managers, and Public Safety should identify carrier interconnection points and coordinate restoral plans, as appropriate.
13-10-5263Network Operators, Service Providers, Equipment Suppliers, and Public Safety should use cables with adequate reliability and cable signal integrity, (e.g., flammability, strain reliefs, signal loss) and should mark as temporary and replace with standard cables as soon as practical any non- standard cables used because of an emergency restoration.
13-10-5264Network Operators and Service Providers should maintain an alternate recovery facility that would duplicate operations and Tracking, Telemetry, Control and Monitoring (TTC&M). The alternate recovery facility should be geographically diverse from the primary facility, maintained and tested on a regular schedule to ensure readiness and timely response. This applies specifically to satellite operators.
13-10-5265Network Operators, Service Providers, Equipment Suppliers, Property Managers and Public Safety should if they are senior management, actively support compliance with established corporate security policies and procedures.