1098 matching practices

NumberBest Practice
13-10-0623Network Operators, Service Providers should perform annual maintenance by performing a discharge test or by using an ohmic test instrument if they are using Valve Regulated Lead Acid (VRLA) batteries.
13-10-0624Network Operators, Service Providers and Property Managers should be encouraged to establish rectifier case history files, by equipment category to facilitate decisions to replace equipment with more efficient equipment based on failure trends.
13-10-0625Network Operators, Service Providers, Property Managers, and Public Safety should consider placing electric utility transformers external to buildings.
13-10-0626Network Operators, Service Providers, Property Managers, and Public Safety should regularly inspect building mechanical equipment (e.g., air handling fans, air compressors, pumps).
13-10-0627Network Operators, Service Providers, Property Managers, and Public Safety should exercise, service, and calibrate AC circuit breakers per manufacturers' recommendations.
13-10-0628Network Operators and Service Providers should develop and implement defined procedures for removal of unused equipment and cable (e.g., cable mining) if it is economically feasible and safe to do so.
13-10-0631Network Operators, Service Providers, Equipment Suppliers, and Property Managers should develop a comprehensive Site Management and/or Building Certification Program to ensure that critical equipment locations have carefully documented procedures to ensure fire safety.
13-10-0634Network Operators, Service Providers, Property Managers and Public Safety should verify together with the Power Company that aerial power lines are not in conflict with hazards that could produce a loss of service during high winds or icy conditions.
13-10-0640Network Operators, Service Providers, Property Managers, and Public Safety should ensure proper air filtration.
13-10-0645Network Operators, Service Providers, Property Managers, and Public Safety should inspect and maintain heating, venting, air conditioning (HVAC) areas.
13-10-0648Network Operators, Service Providers, Property Managers, and Public Safety should ensure certified inspection of boilers & fuel storage units.
13-10-0649Network Operators, Service Providers, Public Safety, and Property Managers should ensure critical network facilities have appropriate fire detection and alarm systems.
13-10-0650Network Operators, Service Providers, Property Managers, and Public Safety should place strong emphasis on activities related to the operation of power systems (e.g., maintenance procedures, alarm system operation, response procedures, and training).
13-10-0651Network Operators, Service Providers, Public Safety, and Property Managers should consider providing diversity within power supply and distribution systems so that a single point of failure (SPOF) is not catastrophic in critical network locations.
13-10-0652Network Operators, Service Providers, Equipment Suppliers, and Property Managers should adhere to applicable power engineering design standards.
13-10-0653Network Operators, Service Providers, Public Safety, and Property Managers should retain complete control concerning when to transfer from the electric utility and operate standby generators.
13-10-0654Network Operators, Service Providers, and Property Managers should generally avoid entering into power curtailment or load shedding contracts with electric utilities.
13-10-0656Network Operators, Service Providers, and Public Safety should establish a requirement for power conditioning, monitoring and protection for sensitive equipment.
13-10-0663Network Operators, Service Providers, Property Managers, and Public Safety should coordinate scheduled power generator tests with all building occupants to avoid interruptions.
13-10-0665Network Operators, Service Providers, and Property Managers should provide and maintain accurate single line drawings of AC switch equipment on-site.