Best Practice Detail
13-11-3253
Public Safety should review routing on new cell towers six months after deployment using call data captured at the PSAP to determine if routing should be adjusted. The review period could be extended to a year in areas with low call volumes.
Status: Rollover New
References/Comments:
Historical events:
- Public Safety
- Cable
- Internet/Data
- Satellite
- Wireless
- Wireline
- Emergency Preparedness
- Essential Services
- CSRIC VII: Rollover New In CSRIC VII
