Skip to content
ATIS Best Practices

Best Practice Detail

13-9-5232

Network Operators, Service Providers, Property Managers, and Public Safety should test fuel reserves used for standby or backup power for contamination at least once a year or after any event (e.g., earth tremor, flood) that could compromise the integrity of the tank housing, fill pipe or supply pipe.

Status: Rollover New

References/Comments: These tests should include inspection for water, sediment, organic contaminates, and any other items that may inhibit the peak performance of the standby/backup generator.

Historical events:

  • Network Operators
  • Service Providers
  • Property Managers
  • Public Safety
  • Cable
  • Internet/Data
  • Satellite
  • Wireless
  • Wireline
  • Disaster Recovery
  • Network Operations
  • Power
  • Procedures
  • CSRIC VII: Rollover New In CSRIC VII