Best Practice Detail
13-10-0557
Equipment Suppliers should take steps to minimize the possibility of having a silent failure on any system component, especially critical components, throughout the life of the product.
Status: Rollover New
References/Comments:
Historical events:
- Equipment Suppliers
- Cable
- Internet/Data
- Satellite
- Wireless
- Wireline
- Hardware
- Network Elements
- Software
- CSRIC VII: Rollover New In CSRIC VII
