Best Practice Detail
13-10-0483
Network Operators and Public Safety should have a master cell site database with configuration parameters, connectivity, and performance statistics that can be used to analyze and audit cell site performance.
Status: Rollover New
References/Comments:
Historical events:
- Network Operators
- Public Safety
- Wireless
- Documentation
- Network Operations
- CSRIC VII: Rollover New In CSRIC VII
