Skip to content
ATIS Best Practices

Best Practice Detail

13-10-0450

Property Managers should maintain current documentation that ensures that the tower loading is consistent with the engineering design (e.g., antenna loading, feedline loading, ice or wind loading).

Status: Rollover New

References/Comments:

Historical events:

  • Property Managers
  • Cable
  • Wireless
  • Wireline
  • Documentation
  • Network Provisioning
  • CSRIC VII: Rollover New In CSRIC VII