Best Practice Detail
13-10-0450
Property Managers should maintain current documentation that ensures that the tower loading is consistent with the engineering design (e.g., antenna loading, feedline loading, ice or wind loading).
Status: Rollover New
References/Comments:
Historical events:
- Property Managers
- Cable
- Wireless
- Wireline
- Documentation
- Network Provisioning
- CSRIC VII: Rollover New In CSRIC VII
