Skip to content
ATIS Best Practices

Best Practice Detail

13-10-0540

Equipment Suppliers should share countermeasures resulting from analysis of an outage with Network Operators and Public Safety using the same equipment.

Status: Rollover New

References/Comments:

Historical events:

  • Equipment Suppliers
  • Public Safety
  • Cable
  • Internet/Data
  • Satellite
  • Wireless
  • Wireline
  • Documentation
  • Industry Cooperation
  • Network Elements
  • Technical Support
  • CSRIC VII: Rollover New In CSRIC VII