Best Practice Detail
13-12-0497
Network Operators, Property Managers and Public Safety should consider connecting the power load to portable generators stored at critical sites, and configuring them for auto-engage in the event of a failover.
Status: Rollover New
References/Comments:
Historical events:
- Network Operators
- Property Managers
- Public Safety
- Cable
- Internet/Data
- Satellite
- Wireless
- Wireline
- Emergency Preparedness
- Power
- Public Safety Service
- CSRIC VII: Rollover New In CSRIC VII
