Skip to content
ATIS Best Practices

Best Practice Detail

13-12-0499

Network Operators, Service Providers should consider ensuring that the back-haul facility equipment located at the cell site is provided with backup power duration equal to that provided for the other equipment at the cell site.

Status: Rollover New

References/Comments:

Historical events:

  • Network Operators
  • Service Providers
  • Wireless
  • Facilities-Transport
  • Network Design
  • Power
  • Public Safety Service
  • CSRIC VII: Rollover New In CSRIC VII